Relay on new ballast from apex on back straight to site entry level crossing
Relay on new ballast passenger line through the station
Relay on new ballast from signal box to facing point (extension)
Relay the siding to the stock shed + weed control
Extend retaining wall by trailing point off station loop
Fit point levers/ point controls to head-shunt and siding
Resolve turntable level problems
Complete airlines to steaming bays
Add in siding to riverside of entrance gate.
Refurbish supporting pillar columns and fixings (revisiting river end supports)
Renew airlines to steaming bays
Provide anti-tilt rails in station
Refurbish body of No. 3 (Union Pacific), and complete mechanics and electrics.
Re-build No. 2 (bogies, electrics and bodywork)
Monitor No. 4 performance (break-downs)
Repaint passenger-riding cars
Deal with wheel flats
Make 2 new artic riding car sets, using new bogies currently in pavilion (4 coaches)
Fix concrete tops to brick pillars
Repaint steel door shutters
Clear side store of “junk” AGAIN
Erect new gantry for signals by signal box
Fix semaphore (?) signals in tandem with associated point work.
Complete a working arrangement/signal system for the ground level track
Put guards on works equipment
Clear out debris from under veranda
Put in drainage system (to soak-a-ways or collecting tanks)
Level and landscape nettle area
Repair roof
Refurbish doors (both ends)
Reset doorframe
Dig out and lay hogging to entrance “drive”
Extend blocks adjoining off-loading bay
Re-bed blocks on car parking side
Review all risk assessments and up-date (next annual review by 31/03/11)
Review rolling stock maintenance records
Review locomotive maintenance records
M.Ainley - 11/06/10